Par
Zoeylola389481
10 juillet 2016
Day one shows up at 11:30 Day 2 doesn't show up at all no calls no text can't reach Jacob. Day 3 shows up at 12:30 runs off at 2 leaves patio unfinished and wants another$200. Job included filling gaps with polymer sand. Instead he filled some with limestone and left the rest open gaps. The top stairs fell off day after as he did not glue them down. The area he was suppose to level the stone. Instead the entire area is 1/4 inch higher than the rest of the patio.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ